PROJECT
Installation Suurhoffbrug
Facts & Numbers
WEIGHT
2900 TONS
LOCATION
MAASVLAKTE
YEAR
2021
Home >
Project description
After years of preparations, the moment was finally there!
Project Suurhoffbridge started.
HEBO Maritiemservice B.V. took care of the load-out and transport through Rotterdam of the 2.900 tons Suurhoffbridge. After the transport our experts turned the bridge, after which the bridge was installed at it’s final position on saturday the 15th of May at 21.03!
With a length of 200m long, 20m wide and more than 40m high, this resulted in beautiful images.